Project Portfolio

Our Solutions

A selection of completed mandates across energy audits, whole-building simulations, recommissioning, and technical studies for institutional, commercial and industrial clients.

1000+
Projects
35+
Years
4
Disciplines
Laval University Campus
Energy Audit
Savings of over 25%

Laval University Campus

Québec City, QC2022-2025

Multiple audits of the larget building on Campus to identify O&M measures as well as deep retrofit measures using ASHRAE auditing guidelines.

Client: Laval University

St.Lawrence Market
Energy Simulation
Net zero carbon

St.Lawrence Market

Toronto2023

Detailed hourly energy model calibrated to ASHRAE 14 and used for a net zero carbon feasbility study.

Client: City of Toronto

Commerce Court
Recommissioning/Energy Audit
18% energy reduction

Commerce Court

Toronto2014

ASHRAE Level II Energy Audit and full recommissioning following CSA Z5001 procedures for a large office complex. Identified 18% energy savings potential.

Client: GWL

Achille-Pettitgrew Building
Recommissioning
22% energy reduction

Achille-Pettitgrew Building

Québec City, QC2023

Systematic recommissioning of HVAC systems and BAS sequences for a mixed usage facility, office and museum. Protocol per CSA Z5001 procedures.

Client: National Defence

Metropolitain University Chiller Plant
Technical Study
Possible efficiency improvement of 12%

Metropolitain University Chiller Plant

Toronto2015

Financial and Technical Review of Chilled Water Equipment and Distribution Piping Network.

Client: Metropolitain University

HVAC System Optimization — Office Campus
Recommissioning
15% energy reduction

HVAC System Optimization — Office Campus

Laval, QC2022

Full recommissioning and control sequence optimization for a 3-building campus with 150,000 sq ft of LEED-certified office space.

Client: Confidential Private Client

School HVAC - Société québécoise des infrastructures
Technical Study
35% better than NECB

School HVAC - Société québécoise des infrastructures

Québec City, QC2023

Evaluation of a design option for mechanical systems serving new schools using whole-building energy model and life-cycle cost analysis. Modelling supported design team decisions on mechanical systems.

Client: Société québécoise des infrastructures

Food Manufacturing Plant
Energy Audit
16% cost reduction identified

Food Manufacturing Plant

Toronto, ON2024

ASHRAE Level II audit including analysis of industrial refrigeration systems, compressed air system and steam priduction system.

Client: Confidential Food Processing Client

Clients we have served

Hydro-Québec
GWL Realty Advisors
Société québécoise des infrastructures
OEE — Office of Energy Efficiency
Industrielle Alliance
La Capitale
CanmetENERGY
Gaz Métro
Gazifère
Rosdev Group
Ville de Québec
UQAM

Have a project in mind?

Our engineers are ready to assess your facility and identify the right service approach.